admin No Comments Mould Preparation Moulds are thoroughly cleaned and coated with shuttering oil to ensure easy removal of the base plate after casting. Read More
admin No Comments On-site Stacking Upon delivery, ground cross beams are carefully and systematically stacked at the customer’s site. Read More
admin No Comments Delivery Poles are securely loaded onto transport vehicles for dispatch to customers. Read More
admin No Comments Stacking After completion of the curing period, the poles are neatly stacked in the stockyard and are ready for dispatch. Read More
admin No Comments Lifting & Curing De-tensioned poles are lifted from the moulds with gantry cranes and relocated for subsequent Processing. Curing: After careful removal Gandhar group employs do these two IS-Standardized waters curing methods. I. Stack curing. II. Tank curing. Read More
admin No Comments Pole Release Preparation Once the comparative strength achieved, the pre-stressed wires are carefully de-tensioned, allowing the poles to be released safely. Read More